AS9102 first article inspection for cable assemblies and harnesses

A first article inspection proves that a supplier's production process can make your part exactly as the drawing defines it. For cable assemblies and wire harnesses, most of what goes wrong in an FAI is not the measuring. It is the accounting.

What AS9102 is

AS9102, Aerospace First Article Inspection Requirement, is published by SAE on behalf of the International Aerospace Quality Group. It defines how an aerospace supplier verifies and documents that a production process produces a part that meets every design requirement, and the report format used to record it. The current revision is C. Aerospace and defense customers usually call it up in their purchase order quality clauses, often with their own additions.

An FAI is performed on a part made by the production process, with production tooling and people. It is not the same as a prototype check or a design validation test.

The three forms

FormNameWhat it records for a harness
Form 1Part Number AccountabilityThe assembly's part number, revision, serial number, drawing, the reason for a full or partial FAI, and any sub-assemblies with their own FAI reports
Form 2Product AccountabilityRaw materials and components (wire, terminals, contacts, connectors, sleeving, labels), special processes, and functional tests required by the design, with the approved sources used
Form 3Characteristic AccountabilityEvery design characteristic: each length, breakout position, note, marking and test requirement, with the actual result

Characteristics on Form 3 are tied to a ballooned drawing: a copy of the drawing with a unique number next to each requirement. The balloon numbers and the Form 3 line numbers must match. That link is what lets a reviewer confirm nothing was missed.

What a harness FAI usually includes

When an FAI is required again

AS9102 requires a new FAI, full or partial, when something affecting the part changes. Typical triggers include:

  1. A design change that affects fit, form or function, such as a drawing revision.
  2. A change in manufacturing source, process, location, tooling or materials that could affect the part.
  3. A lapse in production of two years, measured from the last production operation to the restart.
  4. A natural or man-made event that may affect the process.
  5. A requirement from the customer, for example after a quality escape.

A partial FAI covers only the characteristics affected by the change. Revision C requires the reason for a full or partial FAI to be recorded on Form 1. Your own purchase order terms can add triggers, so state them in the RFQ.

Where harness FAIs usually fail review

How to review a harness FAI report

  1. Check Form 1 against your purchase order: part number, revision, and reason for FAI.
  2. Count the balloons on the drawing and the lines on Form 3. They should match.
  3. Check Form 2 components against your bill of materials and approved sources.
  4. Look for recorded values, not ticks, wherever a value can be measured.
  5. Confirm test parameters in the results match those on the drawing.
  6. Inspect the first article part yourself against a few characteristics chosen at random.

What to ask a supplier

  1. Can you produce an AS9102 report on your own, and can I see a redacted example?
  2. Do you use FAI software or a spreadsheet format, and can you submit through my portal if I use one?
  3. How will you account for wire lists, pinouts and test requirements?
  4. Which of my purchased-in components or sub-assemblies will need their own FAI references?
  5. How do you decide when a new FAI is required, and who approves a partial FAI?

Automotive and industrial equivalents

Automotive programs usually require a Production Part Approval Process submission instead. See PPAP for wire harnesses. Industrial buyers often specify a simpler first article report of their own. Whatever the format, the principle is the same: every requirement on the drawing, accounted for once, with evidence.

Common questions

Is an FAI the same as a first article sample?

No. A first article sample is a part. An FAI is the documented verification that the part, and the process that made it, meet every requirement. You can receive a sample without an FAI report.

Who pays for an FAI?

It is usually quoted as a separate line or included in NRE. Ask for it to be listed separately so quotes are comparable.

Does a build-to-print harness need Form 2 special processes?

If the drawing or your purchase order specifies processes such as soldering to a named standard, potting or overmolding, they are accounted for on Form 2. Check your customer's requirements for which processes count as special.

Related: cable assembly testing, what to put on a harness drawing, and the RFQ checklist.