Best Cable Mfg

Automotive approval

PPAP for wire harnesses: submission levels and the 18 elements

In automotive supply chains, a harness is not approved because a sample looks right. It is approved through the Production Part Approval Process, which asks the supplier to prove its production process can make the part consistently.

What PPAP is

PPAP is published by the Automotive Industry Action Group (AIAG) as one of the core tools used with the IATF 16949 quality management standard. It defines the evidence a supplier provides before production shipments are approved: design records, risk analysis, process controls, measurement results and a signed Part Submission Warrant (PSW). Vehicle makers publish customer-specific requirements that add to or change the AIAG manual, so always read your customer's requirements alongside it.

PPAP is also used outside automotive, for example by industrial and off-highway equipment makers, often in a simplified form.

The five submission levels

LevelWhat is submitted to the customer
Level 1Part Submission Warrant only (and, for designated appearance items, an appearance approval report)
Level 2PSW with product samples and limited supporting data
Level 3PSW with product samples and complete supporting data. This is the default level unless the customer says otherwise.
Level 4PSW and other requirements as defined by the customer
Level 5PSW with product samples and complete supporting data reviewed at the supplier's manufacturing location

The level decides what is submitted. The supplier is generally expected to complete and retain the applicable elements whatever the level.

The 18 elements, applied to a harness

ElementWhat it looks like for a wire harness
1. Design recordsHarness drawing, wiring table, BOM, customer specifications
2. Authorized engineering change documentsApproved changes not yet on the drawing
3. Customer engineering approvalWhere the customer requires it, for example validation results
4. Design FMEAIf the supplier is design responsible
5. Process flow diagramReceiving, cutting, stripping, crimping, sealing, assembly, taping, test, inspection, packing
6. Process FMEARisks such as wrong terminal, low crimp, contact not locked, miswire
7. Control planHow each risk is controlled: crimp monitoring, pull tests, electrical test, error-proofing
8. Measurement system analysisStudies on crimp micrometers, pull testers, length measurement, electrical tester
9. Dimensional resultsLengths, branch positions and other drawing characteristics on the sample parts
10. Material and performance test resultsCrimp performance to the customer's specification, material certifications, electrical results
11. Initial process studiesCapability studies on key characteristics, such as crimp height
12. Qualified laboratory documentationScope and accreditation of the labs used
13. Appearance approval reportOnly for appearance items, which harnesses usually are not
14. Sample production partsParts from the production process
15. Master sampleA retained sample signed off by the customer
16. Checking aidsFormboards used as gauges, test fixtures, go/no-go checks
17. Customer-specific requirementsRecords showing each applicable requirement is met
18. Part Submission WarrantThe signed summary declaration

Harness-specific points that trip up submissions

When a new PPAP is needed

A new or updated submission is generally required for a new part, a design change, a change of material or component source, a change of process or tooling, a move to a new location, or after production has been inactive for a period your customer defines. Customers also require notification before most changes. Check your customer's requirements for the full list and time limits.

PPAP and AS9102 FAI side by side

PPAPAS9102 FAI
Typical industryAutomotiveAerospace and defense
Published byAIAG, with vehicle maker requirementsSAE, for the IAQG
Main questionCan the process produce good parts consistently at rate?Does the production process produce a part meeting every design requirement?
Risk analysis and control planRequired elementsNot part of the report
Signed summaryPart Submission WarrantForm 1

What to ask a supplier

  1. Have you completed PPAP submissions for harnesses at Level 3, and for which kinds of customers?
  2. Can you show a redacted control plan and process FMEA for a similar harness?
  3. How do you perform crimp validation to the specification my customer requires?
  4. Which measurement system studies do you already have for your crimp and test equipment?
  5. How do you notify customers of changes?

Common questions

Is PPAP the same as first article inspection?

No. An AS9102 first article inspection verifies that a part meets its design requirements. PPAP includes dimensional and test results too, but also requires evidence that the process is understood, controlled and capable.

Can a supplier without IATF 16949 certification do PPAP?

Yes, PPAP is a process, not a certificate. Whether your customer accepts a supplier without IATF 16949 certification is a separate question for your customer's requirements.

Which PPAP level should I ask for?

Ask for the level your own customer requires. If you are the end customer, Level 3 is the default and provides complete evidence.

Related: crimp pull testing, supplier audit checklist, and verifying IATF 16949 and other certificates.

Last reviewed 2026-09-17